BUA Group Signs Deal To Build 20MW Gas Based Power Plant For BUA LNG Project

BUA Group and Green Power International PVT Limited have concluded arrangements for construction of a 20 Megawatt (MW) gas based power plant for BUA Liquefied Natural Gas project (LNG) Project.

Information available to HighStreet.ng revealed that the signing of necessary documents signaling imminent commencement of the significant undertaking between the two entities was perfected recently.

The signing ceremony was held at the BUA Group Middle East Office, Dubai, United Arab Emirates.

Chairman Abdul Samad Rabiu attended to the signing for BUA Group – a leading conglomerate with investments in foods, infrastructure, mining and manufacturing – while Mr Ashu Jain, an Executive Director, represented Green Power International PVT Limited at the signing event.

R – L: Abdul Samad Rabiu, Founder/Executive Chairman, BUA Group, and Ashu Jain, Executive Director, Green Power International PVT Limited, during the signing event at the BUA Group Middle East Office, Dubai, UAE.

Leave a Reply

Your email address will not be published. Required fields are marked *

9 + 1 =
Powered by MathCaptcha

You May Also Like

Jamara Home Launches Special Father’s Day Gift Picks

That’s why we’ve made it easy and convenient for our customers to explore a wide range of gifts

Abdul Samad Rabiu Pockets Africa CEO Of The Year Award

Held on May 14, 2026, in Kigali, Rwanda, the high-profile summit brought together over 2,000 corporate executives and heads of state

Transcorp Hilton Abuja Refutes Claims It Cancelled Booking For Political Rally

An inquiry was made on Easter Monday, but there was no availability to accommodate the request. Consequently, no booking was ever made

Big Win As Six UBA Group Subsidiaries Are Named ‘Bank of the Year 2020’

Big Win As Six UBA Group Subsidiaries Are Named ‘Bank of the…